This high-traffic area is always a wet area and removing this will allow us to improve the walkway from the green to the 3rd tee.
The ditch has had a little extension and this will be made bigger when the mini digger is back on site to allow the water to drain off.
The stump grinder will be on-site in a few weeks so the area can be fully levelled off and seeded.
You will see from the pictures the sun will now be able to get into this area.
Another good winter job ticked off.